Branch Office Building

 
  U.S. Postal Service  
  Emeryville, California  
     
  This project consisted of the main work room and service lobby, plus and attached wing for the employee lunch room and locker rooms. The roof framing system consisted of wood and steel bowstring trusses. The main lateral load resisting system consisted of plywood shear walls. However, where open areas were required, two large steel moment-resisting frames were used to resist transverse lateral loads.
$4.5M construction cost.
 
 
 

Portfolio: Government

 
 

Municipal